骚片av蜜桃精品一区_中文字幕无码毛片免费看_丝袜 亚洲 另类 欧美 变态_亚洲一区二区三区四区五区黄_亚洲中文字幕无码av

上海金泰工程機械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

色猫咪av在线观看| 国产精品无码免费播放| 精品无码一区二区三区在线| 亚洲av无码一区二区二三区| 欧美人与禽交zozo| 少妇aaa级久久久无码精品片| 人人爽人人爱| 一本加勒比hezyo无码资源网| 亚洲av婷婷五月产av中文| 精品露脸国产偷人在视频| 国产麻豆成人精品av| 国产呻吟久久久久久久92| 久久香蕉国产线熟妇人妻| 日日碰狠狠添天天爽超碰97| 国产欧美熟妇另类久久久| 亚洲av精品一区二区三区| 又紧又大又爽精品一区二区| 日本边添边摸边做边爱的网站| 久久人妻av一区二区软件| 亚洲一区二区三区av无码| 国产成人欧美视频在线观看| 亚洲日韩乱码中文无码蜜桃臀| 又色又爽又黄的视频网站| 亚洲香蕉成人av网站在线观看| 99精品久久99久久久久| 欧洲吸奶大片在线看| 扒开女人内裤猛进猛出免费视频| 久久精品无码精品免费专区| 午夜寂寞少妇aaa片毛片| 国产av偷闻女邻居内裤被发现| 99国产精品久久久久久久成人| 亚洲精品久久区二区三区蜜桃臀| 4hu四虎永久免费地址ww416| 四虎影视永久地址www成人| 人妻丰满熟妇av无码片| 狠狠色噜噜狠狠狠7777奇米| 草色噜噜噜av在线观看香蕉| 欧美成人aaa片一区国产精品| 欧美熟妇xxxxx欧美老妇不卡| 每日更新在线观看av| 欧美肉大捧一进一出免费视频|