骚片av蜜桃精品一区_中文字幕无码毛片免费看_丝袜 亚洲 另类 欧美 变态_亚洲一区二区三区四区五区黄_亚洲中文字幕无码av

上海金泰工程機械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


?

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry??
and slurry for each passage. All these information can be printed according to pile numbers.

国产成人无码www免费视频播放| 日韩视频中文字幕精品偷拍| 成品人视频ww入口| 亚洲日韩成人av无码网站| 久久人人爽爽人人爽人人片av| 国产精品久久久久9999高清| 亚洲日本va中文字幕| 亚洲国产aⅴ成人精品无吗| 精品人妻午夜一区二区三区四区| 亚洲熟女乱色一区二区三区| 亚洲精品自在在线观看| 国产成人精品日本亚洲专区61| 精品久久久久久久无码人妻热| 美女大量吞精在线观看456| 色翁荡息又大又硬又粗又视频软件| 黑人巨茎大战欧美白妇| 成人网站免费看黄a站视频| 亚洲精品午夜一区人人爽| 亚洲精品国产一区黑色丝袜| 国产欧美日韩精品丝袜高跟鞋| 精品无码久久久久成人漫画| 亚洲av高清在线观看一区二区三区| 成人午夜亚洲精品无码网站| 免费精品99久久国产综合精品| 婷婷俺也去俺也去官网| 精品无码久久久久成人漫画| 欧美精品免费观看二区| 国内老熟妇对白xxxxhd| 又色又爽又黄18禁美女裸身无遮挡| 扒开双腿吃奶呻吟做受视频| 亚洲精品乱码久久久久久日本蜜臀| 欧洲美熟女乱又伦免费视频| 久久久久久av无码免费看大片| 久久久久亚洲av无码专区导航| 欧美深性狂猛ⅹxxx深喉| 福利视频一二三在线观看| 中国女人做爰视频| 日韩 无码 偷拍 中文字幕| 波多野结衣av在线观看| 国产大片内射1区2区| 男女做爰猛烈叫床视频动态图|