骚片av蜜桃精品一区_中文字幕无码毛片免费看_丝袜 亚洲 另类 欧美 变态_亚洲一区二区三区四区五区黄_亚洲中文字幕无码av

上海金泰工程機械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

久久天天躁狠狠躁夜夜免费观看| 8x国产精品视频| 国产免费内射又粗又爽密桃视频| 国产偷窥熟妇高潮呻吟| 成人无码a级毛片免费| 综合 欧美 亚洲日本| 日本乱偷人妻中文字幕| 天堂网www资源在线| 国产午夜精品久久精品电影| 精品人妻少妇一区二区三区| 无码av免费毛片一区二区| 亚洲午夜爱爱香蕉片| 国产色在线 | 日韩| 亚洲最新无码中文字幕久久| 国产成人午夜福利在线观看| 国产日产久久高清欧美一区| 人妻熟女久久久久久久| 亚洲国产欧洲综合997久久| 色天天躁夜夜躁天干天干| 麻豆av一区二区三区| 欧美午夜一区二区福利视频| 亚洲av无一区二区三区| 一道久在线无码加勒比| 国产亚洲精品久久久久久| 97久久精品无码一区二区天美| 亚洲av成人网站在线观看| 又大又黄又粗高潮免费| 亚洲aⅴ天堂av天堂无码麻豆| 无码国内精品久久人妻| 国产a√精品区二区三区四区| 国产综合精品一区二区三区| 亚洲一区 日韩精品 中文字幕| 精品97国产免费人成视频| 免费人成视频在线观看视频| 国产av人人夜夜澡人人爽麻豆| 亚洲欧美日韩成人高清在线一区| 男人边做边吃奶头视频| 婷婷五月日韩av永久免费| 丰满的少妇愉情hd高清果冻传媒| 欧美疯狂性受xxxxx另类| 少妇人妻综合久久中文字幕|