骚片av蜜桃精品一区_中文字幕无码毛片免费看_丝袜 亚洲 另类 欧美 变态_亚洲一区二区三区四区五区黄_亚洲中文字幕无码av

上海金泰工程機械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

国产精品无码一区二区三区免费| 国产女人被狂躁到高潮小说| 国产中年熟女高潮大集合| 成在线人免费视频播放| 国产亚洲精品久久www| 国产 中文 亚洲 日韩 欧美| 久久亚洲精品无码gv| 国产精品久久久久久久9999| 无码任你躁久久久久久久| 亚洲中文久久精品无码ww16| 欧美亚洲精品suv| 男女裸交免费无遮挡全过程| 欧美a级毛欧美1级a大片免费播放| 亚洲av区无码字幕中文色| 精品欧美乱码久久久久久1区2区| 免费人成网站在线观看欧美| 成在线人视频免费视频| 黑人巨大无码中文字幕无码| 久久精品国产亚洲av麻豆图片| 凹凸国产熟女精品视频app| 国产仑乱无码内谢| 久久久久久人妻毛片a片| 丰满的人妻hd高清日本| 国产毛片欧美毛片久久久| 国模丽丽啪啪一区二区| 香港三级日本三级a视频| 亚洲av无码乱码精品国产| 久久婷婷国产剧情内射白浆| 亚洲 都市 校园 激情 另类| 成人免费无码大片a毛片软件| 国产成熟妇女性视频电影| 日韩v亚洲v欧美v精品综合| 亚洲欧美日韩一区在线观看| 97碰碰碰免费公开在线视频| 久久久久成人片免费观看蜜芽| 加勒比无码一区二区三区| 久久天天躁狠狠躁夜夜av| 18无码粉嫩小泬无套在线观看| 国产在线精品一区二区三区不卡| 十八禁视频网站在线观看| 国产午夜精品av一区二区|